Materials for Fill Random (Zone 3) is taken from the excavation
of foundation cofferdam, Dam, Spillway, conduit dodger (volume
available 827,876.86 m3) as well as a pool of quarry on the plan amounted to
2,623,202.64 m3 which is about 0.5 km (stock Pile).
The overall volume of random pile of materials amounted to
3,451,079.50 m3
翻訳されて、しばらくお待ちください..
