TUNGGAKAN BULAN LALU
TAGIHAN MAINTENANCE FEE
Iuran Pengelolaan 16500X63.00X 1 bln ( 01 Aug 2015 - 31 Aug2015 )
Dana Cadangan 1500X63 .00X 1 bln ( 01 Aug 2015- 31 Aug2015 )
TAGIHAN LISTRIK DAN AIR
Electricity:15/06/2015-15/07/2015
Daya Listrik terpasang 8.80KVA
Abodemen 8.80KVA X 30,400
Meter Awal 18,786.00KWH
Mder Akhir 19,102.00KWH
Pemakaian 316 . 00KWH X 1,548
PJU 3 % = ( 267,520 + 489,168 ) x 3 %
Water : 15/06/2015-15/07/2015 – W/AT18-17
Abodemon
Meter Awal 150.00M3
Meter Akhi 153.00M3
Pemakaian 3.00M3
Beban Tetap
SUB TOTAL TAGIHAN
STAMP DUTY