Ketersediaan material tanah, pasir dan batu telah diselidiki dalam Review Desain Waduk Sadawarna, 2011 dan Penyelidikan Geologi Teknik dan Finalisasi Desain Waduk Sadawarna, 2012, dan telah didapatkan hasil bahwa lokasi yang berpotensi sebagai lokasi material tanah (borrow area), Quarry dan borrow area akan berlokasi di sekitar rencana lokasi bendungan Sadawarna. Lokasi material pasir (quarry pasir), dan Lokasi material batu (quarry batu) seperti yang disajikan pada Tabel 1.11 dan Gambar 1.14.
The availability of soil material, sand and stone has been investigated in Sadawarna Reservoir Design Review, 2011 and a geological survey techniques and Design Finalization Reservoir Sadawarna, 2012, and has obtained results that potentially location as the location of the ground material (borrow area), Quarry and borrow area will be located in the vicinity of the dam site plan Sadawarna. Location of materials sand (sand quarry), and the location of stone materials (quarry stone) as presented in table 1.11 and 1.14 Pictures.
翻訳されて、しばらくお待ちください..
