Purpose:
1. Understand and grasp the management of overall production in the Plant [V]
2. Understand the workings of the Japanese
3. Take the positive point of the [V] Plant and make planing to apply at [A/a] plant SCHEDULE:
all items are already planned include: Safety, production Control, Quality,
Skill up the Operator and 5R fulfilled properly in accordance with schedule
A SUMMARY TRAINING
1. Safety
[V] the Plant is concerned and give priority to safety, as an example of activities undertaken, namely Safety Speak
it is very positive to increase employee awareness of safety
[A/a] Plant Safety activities also include: Safety Patrol, Safety inspection and KYT Training
These activities are still control only has not led to increased concern for employee
Planning:
propose to Safety Committee to do activities to raise awareness of the importance of employee
all safety such as Safety Speak every day
2.
* Production Control Management Quality (Abnormal & Scrap)
Feed back and follow-up action to the problem of quality is performed in [V] Plant quickly especially on problems
found in its own processes for example processed using internal system abnormal lathing card
NG when found in the visual processes and Dial the operator makes the loader, abnormal card and the machine immediately repaired
In [A/a] Plant it is still less well underway due to the large number of NG and Abnormal found
Continue: Planning and conducting evaluation of feed back and follow up quality issue action
found in its own process of
翻訳されて、しばらくお待ちください..