The volume of rock in the quarry location is quite abundant. From the results of core drilling
conducted at the site of the quarry can be concluded: The thickness of sediment in the form of
boulder, sand, and gravel between 10 to 20 m more. Of the area along the
hills upstream Village Bajulan only be obtained backup material
rock very much, the planned locations covering a 60,000 m2 (6
hectares), the thickness of the rock would be taken 2.0 m, so that the volume of rock ±
120,000 m3, while the need for rock estimated to be approximately 93 240 m3.