C9.1 Kondisi kelistrikan saat iniSistem kelistrikan Provinsi Sulawesi 翻訳 - C9.1 Kondisi kelistrikan saat iniSistem kelistrikan Provinsi Sulawesi 英語言う方法

C9.1 Kondisi kelistrikan saat iniSi

C9.1 Kondisi kelistrikan saat ini
Sistem kelistrikan Provinsi Sulawesi Selatan saat ini terdiri dari sistem interkoneksi
70 kV, 150 kV, 275 kV dan sistem isolated 20 kV serta sistem tegangan rendah
220 Volt di pulau-pulau terpencil. Sistem interkoneksi tersebut merupakan bagian
dari sistem interkoneksi Sulawesi Bagian Selatan (Sulbagsel), dipasok dari PLTU,
PLTA, PLTG/GU, PLTD dan PLTMH. Transmisi 275 kV digunakan untuk transfer
energi dari PLTA Poso ke Sistem Sulselbar melalui GI Palopo. Sedangkan sistem
kecil isolated 20 kV dan 220 Volt di pulau-pulau seperti di Kabupaten Selayar,
Kabupaten Pangkep, dipasok dari PLTD setempat. Kapasitas terpasang pembangkit
di Provinsi Sulawesi Selatan adalah sebesar 1.437 MW. Daya mampu pembangkit
yang ada sekitar 1.238 MW, sedangkan beban puncak sampai triwulan III tahun
2014 adalah sebesar 1.186 MW. Jumlah gardu induk eksisting di Sulsel adalah 33
buah dengan kapasitas total 1.583 MVA. Mengenai sistem kelistrikan di Kabupaten
Selayar dan pulau-pulau di Kabupaten Pangkep, sepenuhnya dilayani PLTD BBM
dengan daya mampu pembangkit sekitar 5,1 MW dan beban puncak hanya 4,2 MW.
Rasio elektrifikasi di Provinsi Sulawesi Selatan sampai dengan bulan September
2014 sebesar 82,33%.
Tabel C9.1 berikut adalah rincian pembangkit eksisting di Provinsi Sulawesi Selatan,
sedangkan gambar C9.1 adalah peta sistem kelistrikan eksisting Provinsi Sulawesi
Selatan dan rencana pengembangannya.
1450/5000
ソース言語: インドネシア語
ターゲット言語: 英語
結果 (英語) 1: [コピー]
コピーしました!
C9.1 Kondisi kelistrikan saat iniSistem kelistrikan Provinsi Sulawesi Selatan saat ini terdiri dari sistem interkoneksi70 kV, 150 kV, 275 kV dan sistem isolated 20 kV serta sistem tegangan rendah220 Volt di pulau-pulau terpencil. Sistem interkoneksi tersebut merupakan bagiandari sistem interkoneksi Sulawesi Bagian Selatan (Sulbagsel), dipasok dari PLTU,PLTA, PLTG/GU, PLTD dan PLTMH. Transmisi 275 kV digunakan untuk transferenergi dari PLTA Poso ke Sistem Sulselbar melalui GI Palopo. Sedangkan sistemkecil isolated 20 kV dan 220 Volt di pulau-pulau seperti di Kabupaten Selayar,Kabupaten Pangkep, dipasok dari PLTD setempat. Kapasitas terpasang pembangkitdi Provinsi Sulawesi Selatan adalah sebesar 1.437 MW. Daya mampu pembangkityang ada sekitar 1.238 MW, sedangkan beban puncak sampai triwulan III tahun2014 adalah sebesar 1.186 MW. Jumlah gardu induk eksisting di Sulsel adalah 33buah dengan kapasitas total 1.583 MVA. Mengenai sistem kelistrikan di KabupatenSelayar dan pulau-pulau di Kabupaten Pangkep, sepenuhnya dilayani PLTD BBMdengan daya mampu pembangkit sekitar 5,1 MW dan beban puncak hanya 4,2 MW.Rasio elektrifikasi di Provinsi Sulawesi Selatan sampai dengan bulan September2014 sebesar 82,33%.Tabel C9.1 berikut adalah rincian pembangkit eksisting di Provinsi Sulawesi Selatan,sedangkan gambar C9.1 adalah peta sistem kelistrikan eksisting Provinsi SulawesiSelatan dan rencana pengembangannya.
翻訳されて、しばらくお待ちください..
結果 (英語) 2:[コピー]
コピーしました!
Conditions C9.1 electrical current
electricity system in South Sulawesi Province currently consists of interconnected systems
of 70 kV, 150 kV, 275 kV and 20 kV isolated systems and low voltage systems
220 Volt on remote islands. The interconnection system is part
of the system interconnect South Sulawesi (Sulbagsel), supplied from the power plant,
hydropower, gas power plant / GU, diesel and MHP. 275 kV transmission is used to transfer
energy from hydropower Poso Sulselbar through the GI system to Palopo. While the system is
small isolated 20 kV and 220 Volt on islands such as the District Selayar,
Pangkep, supplied from the local diesel. The installed capacity of plants
in South Sulawesi province amounted to 1,437 MW. Power capable of generating
approximately 1,238 MW of existing, while the peak load until the third quarter of
2014 amounted to 1,186 MW. The number of existing substations in the province is 33
pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District
Selayar and islands in Pangkep, fully serviced diesel fuel 1 The condition of electrical current electricity system in South Sulawesi Province currently consists of interconnected systems of 70 kV, 150 kV, 275 kV and 20 kV isolated systems and low voltage systems 220 Volt on remote islands. The interconnection system is part of the system interconnect South Sulawesi (Sulbagsel), supplied from the power plant, hydropower, gas power plant / GU, diesel and MHP. 275 kV transmission is used to transfer energy from hydropower Poso Sulselbar through the GI system to Palopo. While the system is small isolated 20 kV and 220 Volt on islands such as the District Selayar, Pangkep, supplied from the local diesel. The installed capacity of plants in South Sulawesi province amounted to 1,437 MW. Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel 1 The condition of electrical current electricity system in South Sulawesi Province currently consists of interconnected systems of 70 kV, 150 kV, 275 kV and 20 kV isolated systems and low voltage systems 220 Volt on remote islands. The interconnection system is part of the system interconnect South Sulawesi (Sulbagsel), supplied from the power plant, hydropower, gas power plant / GU, diesel and MHP. 275 kV transmission is used to transfer energy from hydropower Poso Sulselbar through the GI system to Palopo. While the system is small isolated 20 kV and 220 Volt on islands such as the District Selayar, Pangkep, supplied from the local diesel. The installed capacity of plants in South Sulawesi province amounted to 1,437 MW. Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel 150 kV, 275 kV and 20 kV isolated systems and low voltage systems 220 Volt on remote islands. The interconnection system is part of the system interconnect South Sulawesi (Sulbagsel), supplied from the power plant, hydropower, gas power plant / GU, diesel and MHP. 275 kV transmission is used to transfer energy from hydropower Poso Sulselbar through the GI system to Palopo. While the system is small isolated 20 kV and 220 Volt on islands such as the District Selayar, Pangkep, supplied from the local diesel. The installed capacity of plants in South Sulawesi province amounted to 1,437 MW. Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel 150 kV, 275 kV and 20 kV isolated systems and low voltage systems 220 Volt on remote islands. The interconnection system is part of the system interconnect South Sulawesi (Sulbagsel), supplied from the power plant, hydropower, gas power plant / GU, diesel and MHP. 275 kV transmission is used to transfer energy from hydropower Poso Sulselbar through the GI system to Palopo. While the system is small isolated 20 kV and 220 Volt on islands such as the District Selayar, Pangkep, supplied from the local diesel. The installed capacity of plants in South Sulawesi province amounted to 1,437 MW. Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel supplied from the power plant, hydropower, gas power plant / GU, diesel and MHP. 275 kV transmission is used to transfer energy from hydropower Poso Sulselbar through the GI system to Palopo. While the system is small isolated 20 kV and 220 Volt on islands such as the District Selayar, Pangkep, supplied from the local diesel. The installed capacity of plants in South Sulawesi province amounted to 1,437 MW. Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel supplied from the power plant, hydropower, gas power plant / GU, diesel and MHP. 275 kV transmission is used to transfer energy from hydropower Poso Sulselbar through the GI system to Palopo. While the system is small isolated 20 kV and 220 Volt on islands such as the District Selayar, Pangkep, supplied from the local diesel. The installed capacity of plants in South Sulawesi province amounted to 1,437 MW. Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel Power capable of generating approximately 1,238 MW of existing, while the peak load until the third quarter of 2014 amounted to 1,186 MW. The number of existing substations in the province is 33 pieces with a total capacity of 1,583 MVA. Regarding the electrical system in the District Selayar and islands in Pangkep, fully serviced diesel fuel
with power capable of generating about 5.1 MW and 4.2 MW peak load only.
The ratio of electrification in South Sulawesi Province until September
2014 at 82.33%.
Table C9.1 The following are the details of the existing power plants in the province of South Sulawesi,
while C9.1 image is a map of the existing electrical system Sulawesi Province
South and its development plan.
翻訳されて、しばらくお待ちください..
 
他の言語
翻訳ツールのサポート: アイスランド語, アイルランド語, アゼルバイジャン語, アフリカーンス語, アムハラ語, アラビア語, アルバニア語, アルメニア語, イタリア語, イディッシュ語, イボ語, インドネシア語, ウイグル語, ウェールズ語, ウクライナ語, ウズベク語, ウルドゥ語, エストニア語, エスペラント語, オランダ語, オリヤ語, カザフ語, カタルーニャ語, カンナダ語, ガリシア語, キニヤルワンダ語, キルギス語, ギリシャ語, クメール語, クリンゴン, クルド語, クロアチア語, グジャラト語, コルシカ語, コーサ語, サモア語, ショナ語, シンド語, シンハラ語, ジャワ語, ジョージア(グルジア)語, スウェーデン語, スコットランド ゲール語, スペイン語, スロバキア語, スロベニア語, スワヒリ語, スンダ語, ズールー語, セブアノ語, セルビア語, ソト語, ソマリ語, タイ語, タガログ語, タジク語, タタール語, タミル語, チェコ語, チェワ語, テルグ語, デンマーク語, トルクメン語, トルコ語, ドイツ語, ネパール語, ノルウェー語, ハイチ語, ハウサ語, ハワイ語, ハンガリー語, バスク語, パシュト語, パンジャブ語, ヒンディー語, フィンランド語, フランス語, フリジア語, ブルガリア語, ヘブライ語, ベトナム語, ベラルーシ語, ベンガル語, ペルシャ語, ボスニア語, ポルトガル語, ポーランド語, マオリ語, マケドニア語, マラガシ語, マラヤーラム語, マラーティー語, マルタ語, マレー語, ミャンマー語, モンゴル語, モン語, ヨルバ語, ラオ語, ラテン語, ラトビア語, リトアニア語, ルクセンブルク語, ルーマニア語, ロシア語, 中国語, 日本語, 繁体字中国語, 英語, 言語を検出する, 韓国語, 言語翻訳.

Copyright ©2025 I Love Translation. All reserved.

E-mail: ilovetranslation@live.com