Material for a heap of Random (zone 3) is taken from the results of excavations andthe Foundation of the Cofferdam, dam, Spillway, konduit Conscientious (volumeavailable 827,876.86 m3) as well as the quarry on the plan of the inundation2,623,202.64 m3 which is about 0.5 Km (stock Pile).The overall volume of the material heap of random is3,451,079.50 m3